The power plant, which is located in Flatanger municipality in Nord-Trøndelag county was built by Namdal Kraftproduksjon. The power plant was taken over by Norsk Grønnkraft after the merger with Namdal Kraftproduksjon in the summer of 2004, and today, the power plant is owned by Småkraft.