The intake is at elevation 263 and the outflow is at elevation 4, which gives a total fall height of 259 metres. The waterway consists of a buried penstock that is nearly 4 km in length.
The power station stands pm the ground just above outlet of the Skravlåga river into the sea by the existing harbour.
Tore Løkke has been the general contractor throughout the implementation of the project. Electricomechanical equipment was supplied by Spetals Verk, and Brødrene Dahl supplied the waterway equipment.